WINFIELD ST over MCLEAN CR

S 24 T 49 N R 2 E · County 113, Missouri · Built 1994 · 1 Lanes · 200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28527
Year Built
1994
Length
19.2 m (63 ft)
Max Span
18.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$224,000
Total Project Cost
$336,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.