PUBLIC WORKS DRIVE over BR OF BELLEAU CR

S 27 T 47 N R 3 E · County 183, Missouri · Built 1998 · 2 Lanes · 10,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
28428
Year Built
1998
Length
14.9 m (48.9 ft)
Max Span
7 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
10,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$102,000
Total Project Cost
$153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.