KAFIR RD over TRIB TO SPRING RVR

S 26 T 29 N R 34 W · County 097, Missouri · Built 1998 · 2 Lanes · 75 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
28279
Year Built
1998
Length
7 m (23 ft)
Max Span
2.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
75
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.