S HAGNY ST over CITY RESERVOIR SPI

S 31 T 32 N R 30 W · County 011, Missouri · Built 1995 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
28273
Year Built
1995
Length
7.6 m (24.9 ft)
Max Span
3.7 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
200
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.