SOUTHERN EXPY over S WYACONDA RVR

S 2199 T 31 N R 13 E · County 031, Missouri · Built 1948 · 2 Lanes · 14,744 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
28252
Year Built
1948
Length
46.3 m (151.9 ft)
Max Span
15.5 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
14,744
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,177,000
Total Project Cost
$1,766,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.