IS 70 W over CST VAN BRUNT BLVD

S 13 T 49 N R 33 W · County 095, Missouri · Built 1960 · 3 Lanes · 45,701 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
279
Year Built
1960
Reconstructed
2010
Length
66.1 m (216.9 ft)
Max Span
20.1 m
Width
14.5 m (47.6 ft)
Lanes
3
Daily Traffic
45,701
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,998,000
Total Project Cost
$2,998,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.