E 23RD ST E over IS 70

S 10 T 49 N R 33 W · County 095, Missouri · Built 1959 · 4 Lanes · 8,325 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
270
Year Built
1959
Length
60.4 m (198.2 ft)
Max Span
18.3 m
Width
17.1 m (56.1 ft)
Lanes
4
Daily Traffic
8,325
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,584,000
Total Project Cost
$2,376,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.