IS 170 E over CST FROST AVE

S 2 T 46 N R 6 E · County 189, Missouri · Built 1978 · 3 Lanes · 27,257 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
2561
Year Built
1978
Length
50.3 m (165 ft)
Max Span
27.7 m
Width
12.9 m (42.3 ft)
Lanes
3
Daily Traffic
27,257
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,058,000
Total Project Cost
$1,587,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.