12TH ST over HICKORY ST BEARDSLEY

S 6 T 49 N R 33 W · County 095, Missouri · Built 1915 · 6 Lanes · 9,496 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
25397
Year Built
1915
Reconstructed
2010
Length
626.1 m (2054.1 ft)
Max Span
45.4 m
Width
18.3 m (60 ft)
Lanes
6
Daily Traffic
9,496
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$21,229,000
Total Project Cost
$31,844,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.