TERMINAL-C OUTBND over AIRPORT ACCESS RD

S 27 T 52 N R 34 W · County 165, Missouri · Built 1972 · 2 Lanes · 11,508 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
25358
Year Built
1972
Length
27.1 m (88.9 ft)
Max Span
13.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
11,508
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$441,000
Total Project Cost
$662,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.