W 211 LN over POLECAT CR
S 35 T 63 N R 28 W · County 081, Missouri · Built 1988 · 1 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
40.216744, -94.024706
This bridge is in worse condition than 68% of bridges in County 081. The average bridge in Missouri is 0 years old; this one is 38 years old.
Nearby Bridges
MO 13 S over POLECAT CR
Built 1937
MO 13 S over LIT POLECAT CR
Built 1937
W 210 AVE over POLECAT CR
Built 1999
MO 13 S over IS 35
Built 1973
IS 35 S over POLE CAT CR
Built 1973
IS 35 S over LIT POLE CAT CR
Built 1975
IS 35 N over POLE CAT CR
Built 1973
E 220 AVE over BR OF POLECAT CR
Built 1974
W 340 ST over CRABAPPLE BR
Built 1962
W 200TH AVE over CRABAPPLE BR
Built 2011
Bridge Details
- Structure #
- 24651
- Year Built
- 1988
- Length
- 12.5 m (41 ft)
- Max Span
- 11.9 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $156,000
- Total Project Cost
- $234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.