MO 77 S over LATERAL DTCH #1

S 21 T 26 N R 17 E · County 133, Missouri · Built 1971 · 2 Lanes · 262 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
2427
Year Built
1971
Length
8.2 m (26.9 ft)
Max Span
3 m
Lanes
2
Daily Traffic
262
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.