IS 170 E over CST CLAYTON RD
S 16 T 45 N R 6 E · County 189, Missouri · Built 1968 · 3 Lanes · 41,851 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
38.637914, -90.343725
This bridge is in worse condition than 51.2% of bridges in County 189. The average bridge in Missouri is 0 years old; this one is 58 years old.
Nearby Bridges
IS 170 W over CST CLAYTON RD
Built 1968
IS 170 E over CST GALLERIA PKWY
Built 1968
IS 170 W over CST GALLERIA PKWY
Built 1968
IS 170 W over CST S BRENTWOOD BLVD
Built 1968
IS 170 E over CST S BRENTWOOD BLVD
Built 1968
CLAYTON RD over BLACK CR
Built 1987
RP IS170E TO IS64W over IS 170 RP IS170E TO BRE
Built 2008
FOREST PARK PKWY E over BRENTWOOD BLVD
Built 2005
RP IS170E TO IS64W over CST S BRENTWOOD BLVD
Built 2008
RP HANLEY DR TO IS over IS 170
Built 2008
Bridge Details
- Structure #
- 2414
- Year Built
- 1968
- Reconstructed
- 1986
- Length
- 29 m (95.1 ft)
- Max Span
- 27.4 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 3
- Daily Traffic
- 41,851
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $671,000
- Total Project Cost
- $1,007,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.