540 TH ROAD over STILLHOUSE BR
S 27 T 62 N R 31 W · County 075, Missouri · Built 1930 · 1 Lanes · 10 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
2
Critical
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 2 | Critical |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
40.152664, -94.369011
This bridge is in worse condition than 99.6% of bridges in County 075. The average bridge in Missouri is 0 years old; this one is 96 years old.
Nearby Bridges
ISAAC MILLER TRAIL over STILLHOUSE BR
Built 1995
395 TH ST over STILLHOUSE BR
Built 2002
405 TH ST over BR OF STILLHOUSE B
Built 2001
405 TH ST over GRAND RVR
Built 1992
370 TH ST over BOATRIGHT BR
Built 2005
RT H S over STILHOUSE BR
Built 1947
405 TH ST over STILLHOUSE BR
Built 1990
562 ND ROAD over BR OF GRAND RVR
Built 1900
ISAAC MILLER TRAIL over MID FK GRAND RVR
Built 1989
512 TH ROAD over LONG BR
Built 1983
Bridge Details
- Structure #
- 23952
- Year Built
- 1930
- Reconstructed
- 1978
- Length
- 15.8 m (51.8 ft)
- Max Span
- 8.8 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $277,000
- Total Project Cost
- $416,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.