150TH RD over SALT POND CR

S 25 T 49 N R 23 W · County 195, Missouri · Built 1978 · 1 Lanes · 35 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 5 Fair

Location

39.012489, -93.396347

This bridge is in worse condition than 72.9% of bridges in County 195. The average bridge in Missouri is 0 years old; this one is 48 years old.

Nearby Bridges

Bridge Details

Structure #
23840
Year Built
1978
Length
15.2 m (49.9 ft)
Max Span
14.9 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
35
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$181,000
Total Project Cost
$272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.