FESTUS-HORINE RD over JOACHIM CR

S 26 T 41 N R 6 E · County 099, Missouri · Built 1920 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
23613
Year Built
1920
Reconstructed
1982
Length
71 m (232.9 ft)
Max Span
35.1 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.