COLLEGE ST over JORDAN CR

S 23 T 29 N R 22 W · County 077, Missouri · Built 1934 · 2 Lanes · 6,360 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
23409
Year Built
1934
Length
10.1 m (33.1 ft)
Max Span
4.3 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
6,360
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$358,000
Total Project Cost
$538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.