SW ALAMO RD over PLUM CR

S 31 T 56 N R 29 W · County 025, Missouri · Built 1979 · 1 Lanes · 35 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 5 Fair
Substructure 5 Fair

Location

39.61775, -94.204972

This bridge is in worse condition than 68.2% of bridges in County 025. The average bridge in Missouri is 0 years old; this one is 47 years old.

Nearby Bridges

Bridge Details

Structure #
23193
Year Built
1979
Reconstructed
2011
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
35
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.