W MAIN ST over BRUSHY CR

S 5 T 45 N R 21 W · County 159, Missouri · Built 1970 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

38.713961, -93.262994

This bridge is in worse condition than 61.1% of bridges in County 159. The average bridge in Missouri is 0 years old; this one is 56 years old.

Nearby Bridges

Bridge Details

Structure #
23176
Year Built
1970
Length
12.2 m (40 ft)
Max Span
3.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,000
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$360,000
Total Project Cost
$539,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.