IMPALA DR over MUSSEL CR
S 25 T 61 N R 18 W · County 211, Missouri · Built 1995 · 2 Lanes · 30 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
40.048939, -92.864422
This bridge is in worse condition than 92.8% of bridges in County 211. The average bridge in Missouri is 0 years old; this one is 31 years old.
Nearby Bridges
MO 11 S over MUSSEL FK DRAIN DT
Built 2016
WINDSONG RD over MUSSEL FK CR
Built 2018
MO 11 S over MUSSEL FK
Built 2024
MO 11 S over MUSSEL FK
Built 1933
MO 11 S over LIT MUSSEL FK
Built 1933
LOEFFLER STORE TRL over LIT MUSSEL CR
Built 1992
MONTGOMERY WOODS T over BR OF LIT MUSSEL C
Built 1991
ACADEMY AVE. over BR OF MUSSEL FK
Built 1993
LOEFFLER STORE TRL over BR OF LIT MUSSEL C
Built 2008
ASPEN ST over MUSSEL FK
Built 1993
Bridge Details
- Structure #
- 22473
- Year Built
- 1995
- Length
- 36.6 m (120.1 ft)
- Max Span
- 15.2 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Prestressed Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $380,000
- Total Project Cost
- $570,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.