BECKER JOERLING RD over TRIB OF FEMME OSAG

S 16 T 45 N R 1 E · County 183, Missouri · Built 1991 · 2 Lanes · 69 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
22414
Year Built
1991
Length
18 m (59.1 ft)
Max Span
17.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
69
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.