GOLD RD over TURKEY CR
S 21 T 58 N R 20 W · County 115, Missouri · Built 1960 · 1 Lanes · 20 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
39.831222, -93.141611
This bridge is in worse condition than 70.9% of bridges in County 115. The average bridge in Missouri is 0 years old; this one is 66 years old.
Nearby Bridges
GAS RD over TURKEY CR
Built 2015
GLADE RD over TURKEY CR
Built 1987
GLADE RD over LIT TURKEY CR
Built 2000
FORT RD over MUDDY CR
Built 1990
FORT DR over DTCH TO MUDDY CR
Built 2000
GURNEY RD over LIT TURKEY CR
Built 1994
GENOA RD over TURKEY CR
Built 2000
FALCON DR over UNKNOWN STR
Built 1995
FARLEY RD over MUDDY CR
Built 2002
FARLEY RD over LIT MUDDY CR
Built 2002
Bridge Details
- Structure #
- 22406
- Year Built
- 1960
- Reconstructed
- 1987
- Length
- 16.8 m (55.1 ft)
- Max Span
- 8.2 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 20
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $199,000
- Total Project Cost
- $298,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.