RICHLAND RD over N FK GRINDSTONE CR

S 15 T 48 N R 12 W · County 019, Missouri · Built 1970 · 2 Lanes · 500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
21853
Year Built
1970
Length
14.3 m (46.9 ft)
Max Span
13.7 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$258,000
Total Project Cost
$387,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.