QUINCE AVE over PIERRE FLECHE CR
S 11 T 50 N R 19 W · County 195, Missouri · Built 1910 · 1 Lanes · 15 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
3
Serious
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 3 | Serious |
| Substructure | 6 | Satisfactory |
Location
39.123664, -92.962831
This bridge is in worse condition than 96.1% of bridges in County 195. The average bridge in Missouri is 0 years old; this one is 116 years old.
Nearby Bridges
230TH RD over PIERRE FLECHE CR
Built 1975
RT AC S over PIERRE FLECHE CR
Built 1960
POPLAR RD over PIERRE FLECHE CR
Built 1994
RT P E over BUZZARD CR
Built 1960
RT P E over BORGMAN BR
Built 1946
PECAN AVE over PIERRE FLECHE CR
Built 1993
250TH RD over FISH CR
Built 1900
260TH RD over BUZZARD BR
Built 1920
COUNTY RD 317 over UNKNOWN CR
Built 1987
COUNTY RD 319 over COOPERS CR
Built 2014
Bridge Details
- Structure #
- 21828
- Year Built
- 1910
- Length
- 21.3 m (69.9 ft)
- Max Span
- 21.3 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 15
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $351,000
- Total Project Cost
- $527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.