COUNTY RD 488 over DRAIN DTCH

S 2 T 16 N R 10 E · County 155, Missouri · Built 1990 · 1 Lanes · 25 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
21729
Year Built
1990
Length
73.2 m (240.2 ft)
Max Span
14.6 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
25
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$684,000
Total Project Cost
$1,026,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.