DUELLO RD over TRIB OF PERUQUE CR

S 1811 T 46 N R 2 E · County 183, Missouri · Built 1900 · 2 Lanes · 3,320 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
21557
Year Built
1900
Reconstructed
1985
Length
9.1 m (29.9 ft)
Max Span
8.5 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
3,320
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.