GRAPEVINE ST over SWEEZER CR
S 20 T 58 N R 15 W · County 121, Missouri · Built 1989 · 1 Lanes · 15 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.814714, -92.606253
This bridge is in worse condition than 16.2% of bridges in County 121. The average bridge in Missouri is 0 years old; this one is 37 years old.
Nearby Bridges
GRISTMILL ST over SWEEZER CR
Built 1989
HORIZON ST over CAMP BR
Built 2001
HEMLOCK RD over SWEEZER CR
Built 1988
GARDEN ST over SWEEZER CR
Built 2001
RT OO S over MID FK CHARITON RV
Built 2011
HORSESHOE AVE over MID FK CHARITON RV
Built 1991
FOREST ST over UNNAMED BR
Built 1987
RT O S over TOWN CR
Built 1952
GIRAFFE ST over SWEEZER CR
Built 2000
HIAWATHA ST over MID FK CHARITON RV
Built 1989
Bridge Details
- Structure #
- 21243
- Year Built
- 1989
- Length
- 14.3 m (46.9 ft)
- Max Span
- 14 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 15
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $174,000
- Total Project Cost
- $260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.