PROJECT RD over PIERCE CR OF L MER

S 19 T 41 N R 2 E · County 071, Missouri · Built 1990 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
21182
Year Built
1990
Length
28.3 m (92.8 ft)
Max Span
13.7 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.