COUNTY RD 345 over SALT RVR

S 18 T 57 N R 10 W · County 205, Missouri · Built 1920 · 1 Lanes · 50 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 4 Poor
Substructure 5 Fair

Location

39.741175, -92.065425

This bridge is in worse condition than 89.6% of bridges in County 205. The average bridge in Missouri is 0 years old; this one is 106 years old.

Nearby Bridges

Bridge Details

Structure #
21112
Year Built
1920
Length
30.8 m (101 ft)
Max Span
30.5 m
Width
3.7 m (12.1 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$473,000
Total Project Cost
$710,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.