MO 20 E over SALT FK CR
S 24 T 50 N R 25 W · County 107, Missouri · Built 1969 · 2 Lanes · 1,619 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 4 | Poor |
Location
39.107892, -93.603181
This bridge is in worse condition than 96.7% of bridges in County 107. The average bridge in Missouri is 0 years old; this one is 57 years old.
Nearby Bridges
GOODWIN RD over TRIB OF SALT FORK
Built 1982
SUNNY BANK RD over SALT FORK CR
Built 1990
SCHOOLVILLE RD over TRIB S FK BLACKWAT
Built 2011
MO 20 E over SALT FK CR
Built 1969
WILLOW BRANCH RD over SALT FORK CR
Built 1966
BUFORD RD over WILLOW BR
Built 1990
HEDGEWOOD RD over LIT TABO CR
Built 2016
HODGE RD over UNKNOWN BR
Built 1996
THREE GROVES RD over SALT FORK CR
Built 1950
DAVIS RD over MULKEY BR CR
Built 1999
Bridge Details
- Structure #
- 2060
- Year Built
- 1969
- Length
- 9.3 m (30.5 ft)
- Max Span
- 4 m
- Lanes
- 2
- Daily Traffic
- 1,619
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $204,000
- Total Project Cost
- $306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.