COUNTY RD 575 over MID FABIUS RVR

S 24 T 60 N R 7 W · County 111, Missouri · Built 1996 · 2 Lanes · 60 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
20559
Year Built
1996
Length
55.8 m (183.1 ft)
Max Span
18.3 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
60
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.