COUNTY RD 794 over DRAIN DTCH

S 18 T 23 N R 12 E · County 207, Missouri · Built 1970 · 1 Lanes · 35 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
20545
Year Built
1970
Length
12.2 m (40 ft)
Max Span
11.9 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
35
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.