POE AVE over TRIB OF MID FABIUS

S 4 T 64 N R 13 W · County 197, Missouri · Built 1965 · 1 Lanes · 10 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
20518
Year Built
1965
Reconstructed
2000
Length
13.4 m (44 ft)
Max Span
8.2 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$244,000
Total Project Cost
$366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.