COUNTY RD 253 over BEAR CR

S 8 T 33 N R 24 W · County 167, Missouri · Built 2000 · 2 Lanes · 30 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20259
Year Built
2000
Length
56.4 m (185 ft)
Max Span
22.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
30
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.