BUCKEYE RD over LITTLE CR

S 31 T 41 N R 5 E · County 099, Missouri · Built 1900 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
20187
Year Built
1900
Reconstructed
2009
Length
9.3 m (30.5 ft)
Max Span
9 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
400
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$163,000
Total Project Cost
$244,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.