COUNTY RD 258 over BEAR CR

S 24 T 57 N R 6 W · County 127, Missouri · Built 1998 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20170
Year Built
1998
Length
16.2 m (53.1 ft)
Max Span
15.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.