SMYRNA RD over FINLEY RVR
S 18 T 27 N R 20 W · County 043, Missouri · Built 1912 · 1 Lanes · 300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
2
Critical
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 2 | Critical |
| Substructure | 5 | Fair |
Location
37.037253, -93.170983
This bridge is in worse condition than 99.2% of bridges in County 043. The average bridge in Missouri is 0 years old; this one is 114 years old.
Nearby Bridges
SMYRNA RD over FINLEY RVR
Built 2025
SMYRNA RD over PARCHED CORN CR
Built 2003
SMYRNA RD over BR OF FINLEY CR
Built 2014
SMYRNA RD over BR OF FINLEY CR
Built 1995
RIVERSIDE RD over FINLEY RVR
Built 2020
SMYRNA RD over BR OF FINLEY CR
Built 1995
PARCH CORN RD over BR OF FINLEY CR
Built 2002
RIVERSIDE RD over BR OF FINLEY RVR
Built 2019
W MCCRACKEN ST over FINLEY RVR OVRFLW
Built 1942
W MCCRACKEN ST over FINLEY RVR OVRFL
Built 1942
Bridge Details
- Structure #
- 20153
- Year Built
- 1912
- Reconstructed
- 2004
- Length
- 85.6 m (280.8 ft)
- Max Span
- 36.3 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 300
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,435,000
- Total Project Cost
- $2,152,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.