FAIRVIEW RD over TRIB OF SUGAR CR

S 14 T 22 N R 31 W · County 119, Missouri · Built 1935 · 2 Lanes · 45 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
20058
Year Built
1935
Length
9.1 m (29.9 ft)
Max Span
4.3 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
45
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.