W DIVISION RD over E FK POST OAK CR

S 22 T 46 N R 26 W · County 101, Missouri · Built 1900 · 2 Lanes · 285 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
19847
Year Built
1900
Reconstructed
1988
Length
39.6 m (129.9 ft)
Max Span
15.2 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
285
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.