IS 29 N over CST N TIFFANY SPRINGS PK

S 36 T 52 N R 34 W · County 165, Missouri · Built 1968 · 3 Lanes · 31,398 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
1970
Year Built
1968
Reconstructed
1985
Length
55.8 m (183.1 ft)
Max Span
16.5 m
Width
15.8 m (51.8 ft)
Lanes
3
Daily Traffic
31,398
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,166,000
Total Project Cost
$1,748,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.