SE BETHANY DR over N MUD CR TRIB

S 17 T 55 N R 26 W · County 025, Missouri · Built 1936 · 2 Lanes · 10 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
19587
Year Built
1936
Reconstructed
2006
Length
9.3 m (30.5 ft)
Max Span
9 m
Width
5.1 m (16.7 ft)
Lanes
2
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$192,000
Total Project Cost
$289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.