FARM RD 225 over BR OF POMME TERRE
S 15 T 31 N R 20 W · County 077, Missouri · Built 1900 · 2 Lanes · 336 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
37.4011, -93.11365
This bridge is in worse condition than 96.2% of bridges in County 077. The average bridge in Missouri is 0 years old; this one is 126 years old.
Nearby Bridges
FARM RD 225 over POMME DE TERRE RVR
Built 1987
FARM RD 235 over SELPH BR
Built 2016
FARM RD 231 over MUTTON HOLLOW
Built 2012
FARM RD 221 over POMME DE TERRE RVR
Built 2008
FARM RD 221 over BR OF POMME DE TER
Built 2004
RT E E over POMMME DE TERRE RV
Built 1993
RT AA E over POMME DE TERRE RVR
Built 1966
FARM RD 239 over POMME DE TERRE RVR
Built 1990
US 65 N over POMME DE TERRE RVR
Built 1967
US 65 S over POMME DE TERRE RVR
Built 2008
Bridge Details
- Structure #
- 19576
- Year Built
- 1900
- Length
- 16.2 m (53.1 ft)
- Max Span
- 8.2 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 336
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $345,000
- Total Project Cost
- $517,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.