DUBINEER CIR over RED COAT DR
S 19 T 49 N R 32 W · County 095, Missouri · Built 1972 · 3 Lanes · 2,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.051731, -94.477581
This bridge is in worse condition than 53.9% of bridges in County 095. The average bridge in Missouri is 0 years old; this one is 54 years old.
Nearby Bridges
BLUE RIDGE CUTOFF over IS 70
Built 2009
DUBINEER CIR over ROYAL WAY
Built 1972
STADIUM DR E over IS 70
Built 1971
RP IS435N TO IS70W over IS 70
Built 2021
RP IS435N TO IS70W over RP IS435S TO IS70E
Built 2021
RAYTOWN RD over ROUND GROVE CR
Built 2009
RAYTOWN RD over ROUND GROVE CR
Built 2009
IS 435 N over IS 70 US 24 RP IS70W T
Built 2020
IS 435 N over RP IS435N TO IS70W
Built 2020
IS 435 N over RP IS435S TO IS70E
Built 2020
Bridge Details
- Structure #
- 19500
- Year Built
- 1972
- Length
- 34.1 m (111.9 ft)
- Max Span
- 26.3 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 3
- Daily Traffic
- 2,200
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $786,000
- Total Project Cost
- $1,179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.