HOUSTON LAKE DR over DAM SPLWY

S 24 T 51 N R 33 W · County 165, Missouri · Built 1960 · 1 Lanes · 120 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
18929
Year Built
1960
Reconstructed
1994
Length
31.7 m (104 ft)
Max Span
5.2 m
Width
5.1 m (16.7 ft)
Lanes
1
Daily Traffic
120
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$485,000
Total Project Cost
$727,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.