RED BIRD RD over BOURBEUSE RVR

S 23 T 40 N R 6 W · County 073, Missouri · Built 1928 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
18924
Year Built
1928
Length
15.5 m (50.9 ft)
Max Span
2.4 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
30
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$266,000
Total Project Cost
$399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.