RT E E over PIN OAK CR

S 3 T 44 N R 3 W · County 071, Missouri · Built 1968 · 2 Lanes · 1,967 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
1788
Year Built
1968
Length
56.4 m (185 ft)
Max Span
21.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,967
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.