COUNTY RD M-50A over BR OF ELBOW CR

S 22 T 22 N R 18 W · County 213, Missouri · Built 1996 · 2 Lanes · 30 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
17789
Year Built
1996
Length
9.1 m (29.9 ft)
Max Span
4.5 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
30
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$192,000
Total Project Cost
$289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.