HARMONICA RD over UP RR

S 34 T 65 N R 24 W · County 129, Missouri · Built 1901 · 2 Lanes · 35 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 6 Satisfactory
Substructure 4 Poor

Location

40.390008, -93.579986

This bridge is in worse condition than 83% of bridges in County 129. The average bridge in Missouri is 0 years old; this one is 125 years old.

Nearby Bridges

Bridge Details

Structure #
17756
Year Built
1901
Length
64.3 m (211 ft)
Max Span
20.1 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
35
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$910,000
Total Project Cost
$1,365,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.