NICHOLS ST over KCS RR
S 8 T 47 N R 9 W · County 027, Missouri · Built 1940 · 2 Lanes · 1,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
4
Poor
Substructure
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 4 | Poor |
| Substructure | 2 | Critical |
Location
38.857342, -91.948425
This bridge is in worse condition than 99.3% of bridges in County 027. The average bridge in Missouri is 0 years old; this one is 86 years old.
Nearby Bridges
BU 54 E over SMITH BR
Built 1926
VINE ST over SMITH BR OF STINSO
Built 1935
E 10TH ST over SMITH BR OF STINSO
Built 1925
W 7TH ST over STINSON CR
Built 2014
E 8TH ST over SMITH BR OF STINSO
Built 1925
BLUFF ST over STINSON CR
Built 1981
W 7TH ST over WESTMINSTER BR
Built 2003
BU 54 E over STINSON CR
Built 2010
E 2ND ST over STINSON CR
Built 2022
INDUSTRIAL ST over SMITH CR
Built 1930
Bridge Details
- Structure #
- 17541
- Year Built
- 1940
- Length
- 33.2 m (108.9 ft)
- Max Span
- 10.1 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $759,000
- Total Project Cost
- $1,138,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.