FINCH AVE over UP RR

S 12 T 65 N R 24 W · County 129, Missouri · Built 1940 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
17489
Year Built
1940
Length
46.6 m (152.9 ft)
Max Span
6.4 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
100
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$470,000
Total Project Cost
$706,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.